Boca Raton Condo Remodeling.
We Handle the Board.

Condo remodels don't fail on craft. They fail when someone misses an elevator reservation, submits the wrong Certificate of Insurance, or installs a floor that violates the neighbor's noise limits. We handle the alteration agreements, the freight elevators, and the IIC-50 sound compliance before demo ever starts.

Oceanfront condo remodel
Oceanfront residenceNo. 01 / 2025
Timeline
4–8 months totalBoard + permit + build; written schedule
Investment
$50K – $1.5M+Single-room refresh to luxury oceanfront gut
Work hours
Per buildingCommon pattern: 9am–4pm · loud work 10am–3pm
Post-Project
DocumentedTerm set in project agreement · product guarantees transfer directly to you
The reality

Why Condo Remodels Fail

If a condo remodel goes south, it almost never has to do with the actual carpentry or plumbing. It fails because someone didn't read the building's 30-page rulebook.

Contractors get kicked out because they missed a clause in the alteration agreement, submitted a Certificate of Insurance missing a "CG 20 37" endorsement, or laid tile over bare concrete—triggering a noise complaint from the neighbor below because the underlayment didn't meet the IIC-50 code.

A condo isn't just an apartment. It's a highly regulated shared environment. You share plumbing stacks and fire-rated walls. Your board acts as a second permit authority, often stricter than the City of Boca Raton. Your workday is a tiny window—usually 9am to 4pm—and "loud work" is often restricted to just a few hours. We don't fight these rules. We've built around them since 1999.

Project Scope & Scale

From Light Refreshes to Oceanfront Guts

The rules don't change whether you're refreshing a bedroom or gutting a 4,000-square-foot oceanfront unit. The board process, the COI, and the freight-elevator logistics all apply. Below are the typical ranges we see in the Boca Raton market.

Full-unit luxury oceanfront condo gut remodel
01 Full-unit gut

Everything new, inside the shell

A complete gut of the interior kitchen, all baths, flooring, paint, electrical, plumbing within the existing stack, finish carpentry. The most logistics-intensive condo project type because every trade runs inside the same work-hour window. Almost every full gut requires sound-compliant floor reassembly and often a sub-panel upgrade.

Typical · $400K – $1.5M+ · 14–20 weeks on-site
Luxury condo kitchen remodel
02 Kitchen-only remodel

New cabinets, stone, appliances stack stays

Kitchen stays in its existing footprint because the plumbing stack is locked. New cabinets, stone, tile backsplash, appliances, sink and faucet, paint, lighting, and any electrical changes within the unit. Often runs alongside new flooring in the main living area. Board approval still required this is not a cosmetic project.

Typical · $80K – $225K · 8–12 weeks on-site
Condo primary bath remodel
03 Primary bath gut

Waterproofed, ventilated, sound-compliant

Primary-suite bath rebuilt to current waterproofing and ventilation standards sheet or liquid-applied membrane (Schluter Kerdi or Laticrete Hydro Ban) over cement backer, 24-hour flood test before tile, fan sized per HVI-2100. Same waterproofing discipline as our stand-alone bathroom remodels, layered with condo board and COI requirements.

Typical · $55K – $150K · 6–10 weeks on-site
Condo guest bath remodel
04 Guest / secondary bath

Smaller footprint, same discipline

Guest baths and powder rooms in Boca condos range from 57 to full hall-bath size. Smaller scope doesn't shorten the board-approval window the building rules are identical. We often pair a guest-bath remodel with a primary-bath gut to compress board and freight-elevator overhead onto one project.

Typical · $35K – $80K · 4–8 weeks on-site
Condo single room refresh
05 Single-room refresh

Flooring, paint, lighting, closet build-out

A living room, bedroom, office, or den rebuilt without touching wet areas new flooring (with underlayment spec'd for IIC 50), paint, baseboards, lighting, often a custom closet build-out. Board approval is lighter than a wet-area project, but COI and elevator rules still apply in full. Often the first project a seasonal resident tackles in their first year of ownership.

Typical · $50K – $100K · 4–6 weeks on-site
Clean bright open-concept condo pre-sale staging
06 Pre-sale refresh

Ready to list in 4–6 weeks

Paint, flooring, updated lighting, cabinet refacing or replacement within existing layout, staging-grade finishes. Scoped to return more than it costs in a resale market, typically for owners listing for Q1 or Q4 season. Board approval still required but usually moves faster for strictly interior non-wet work; we assemble the package while the broker gets the listing ready.

Typical · $50K – $120K · 4–6 weeks on-site
How Long Will It Take?

Permits, Logistics, and the Build Schedule

Here is how a typical Boca condo remodel runs. Single-room refreshes take 16–20 weeks; a full oceanfront gut can run 32+ weeks. We order long-lead materials at permit issuance so shipping clocks run in parallel with the build.

01
Weeks 1–3

Board package & approval

We assemble your alteration agreement, COI, timeline, and engineer letters. Submitted complete on day one to prevent multi-month revision cycles with your HOA.

02
Weeks 3–9

HOA review & logistics

Condo boards typically meet monthly. Expect 2–6 weeks for approval. Once approved, we lock in your freight-elevator reservations and post your COI.

03
Weeks 9–16

City permits & procurement

Boca Raton permits run 5–7 weeks. We run this clock concurrently with long-lead material orders (custom cabinets, imported stone) so your project isn't waiting on shipping.

04
Weeks 16–22

Demo & rough trades

Your unit is sealed with negative-pressure fans. Demo is executed strictly within your building's 10am–3pm loud-work window, followed by rough plumbing, HVAC, and firestopping.

05
Weeks 22–30

Waterproofing & drywall

We pass City rough inspections, execute 24-hour flood tests in wet areas, and build your floor assembly to strictly meet Florida's IIC-50 acoustic transmission code.

06
Weeks 30+

Finishes & final handover

Cabinets, stone, and fixtures are installed. We handle final City inspections, the board closeout walk, and hand you a complete binder of permits, lien waivers, and commitments.

Pricing

Realistic Condo Budgets for 2026

A condo logistics premium is real. Freight-elevator windows, strict work hours, COI churn, and board inspections mean condo labor runs roughly 20–40% higher per square foot than single-family homes. The ranges below are based on our last 36 months of Boca Raton market data. Your project is priced documented only after Jorge has walked your unit.

Tier 01 Entry

Single-room & pre-sale refresh

$50K – $150KOne room, or paint + floors + light cosmetic
Scope1 room, OR flooring + paint unit-wide
Wet areasNone touched
Board reviewLighter (non-wet, non-stack)
Sound rulesIIC-50 underlayment if hard floor
Good forPre-sale, seasonal update
Tier 02 Most common

Multi-room remodel

$150K – $400KKitchen + 1–2 baths, flooring, paint, systems
ScopeKitchen + 12 baths, unit-wide floors
Wet areasFull gut, waterproofed, flood-tested
Board reviewFull package, engineer letters where needed
Sound rulesIIC-50 assembly, field test on closeout if required
Good forLong-term primary or seasonal residence
Tier 03 Fully custom

Full oceanfront / estate-grade gut

$400K – $1.5M+Imported finishes, natural stone, custom millwork
ScopeComplete interior gut, 2,000–4,000+ sqft
Wet areasMultiple baths, imported stone, steam, linear drains
Board reviewFull package, multiple engineer letters, staged inspections
Sound rulesFull acoustic assembly, field IIC test, sometimes NIC
Good forOceanfront + intracoastal primary residences

Project-total ranges labor (with condo logistics premium), material, permits, engineering, contingency. Quotes are fixed-price, written, valid 30 days. Florida sales tax and county surtax apply to taxable materials. Allowance lines for long-lead items (imported stone, specialty appliances, custom millwork) itemized and reconciled at final.

Code Compliance

How to Avoid a Noise Lawsuit from the Unit Below

Hardwood and tile floors trigger the most neighbor complaints in Boca condos because contractors ignore acoustic code.

A bare concrete slab fails Florida's IIC-50 sound requirement. Lay tile directly on that slab, and the downstairs neighbor hears every step. Eventually, the board makes you tear up the new floor.

We engineer your floor to pass IIC-50 using acoustic underlayment and perimeter sealants. We submit the math to your board before ordering material.

Spec floor assembly for IIC 50

Typical delta-IIC by component

Subfloor baseline Starting Point

Bare concrete slab rates a failing IIC 28–35 (below code).

Cork underlayment +15 to +22 IIC

Yields IIC 43–57. A 6mm or 12mm cork mat is often enough with the right finish.

Acoustic mat +18 to +28 IIC

Yields IIC 46–63. High-performance rubber or Pro-Flex is robust for hardwood or tile.

Engineered hardwood Mid impact

Pairs well with an acoustic mat to comfortably meet IIC 50. Installed floating or glue-down per board rules.

Porcelain tile High impact

The noisiest finish without robust underlayment. Meets IIC 50 when paired with a specified uncoupling mat.

Perimeter gap Flanking control

A 1/4" gap around all walls filled with acoustic sealant. Prevents side-path noise and is completely covered by baseboards.

Our standard practice:
  • spec the full assembly in your project agreement
  • submit to board with alteration agreement
  • schedule field IIC test (ASTM E1007) at closeout if board requires
We avoid:
  • install hardwood or tile direct over bare slab
  • rely on manufacturer's marketing claim without the spec sheet
  • skip the perimeter gap
Navigating the HOA

How We Get Your Project Approved

Single-family homes fail on craft. Condos fail on paperwork. Every contractor who has been ejected from an oceanfront building failed one of these four gates. Here is how we guarantee your project never gets shut down.

Gate 01 Board approval

Alteration agreement, reviewed & signed

Every condo remodel needs a signed alteration agreement before demo. We assemble your entire package—including scope drawings, insurance, and engineer letters—and track the board's meeting cadence. Incomplete packets add 2–4 weeks per revision cycle, so we submit everything flawlessly the first time.

Package Assembled by us submitted complete tracked to approval
Gate 02 COI & insurance

The right names, the right endorsements

The Certificate of Insurance your building requires names the association, the management company, and usually the board as additional insureds and typically requires endorsements for both ongoing and completed operations, plus a waiver of subrogation. Wrong names or missing endorsements is a common reason freight-elevator releases get delayed. Our agent typically issues a COI the same business day on request. We carry workers comp on our employees and verify each subcontractor's coverage or Florida Certificate of Election to be Exempt.

Issued Typically same business day AI + WoS endorsements verified on every sub
Gate 03 Logistics plan

Elevator, hours, parking, dumpster pre-booked

Before demo, we publish a rolling 4-week logistics plan: freight-elevator reservations (4872 hour lead), loud-work windows aligned to your building's rules (typically 10am3pm), parking staging, bagged-debris routing, and neighbor-notice flyers for the stack. The schedule lives on paper, not in someone's head.

Published 4-week rolling posted with concierge updated weekly
Gate 04 Shared infrastructure

Stacks, panels, firestopping, HVAC riser

Stack routing is typically locked your kitchen and baths stay in their existing footprint within inches. Electrical sub-panel capacity is a hard ceiling (1980s buildings: 60100 A; 2000s: 100200 A; new luxury: 200400 A). HVAC type (through-wall PTAC, closet air handler, chilled-water fan coil) constrains unit replacement and closet sizing. Every penetration of a fire-rated wall or floor-ceiling assembly gets a UL-listed firestop. We verify all four before scope commit.

Verified Stack panel HVAC firestop before scope commit
Condo FAQ

Questions we get on every condo call

How much does a condo remodel cost in Boca Raton?
Ranges from recent Boca market data and our own condo invoicing. Single-room refreshes and pre-sale cosmetic work typically run $50K–$150K. Multi-room remodels and standard full-unit work (kitchen + 1–2 baths + flooring + paint + lighting) usually fall in the $150K–$400K range. Luxury oceanfront and intracoastal full-unit gut remodels with imported finishes, natural stone throughout, and custom millwork run $400K–$1.5M+. Boca condo remodels typically cost 20–40% more per square foot than comparable single-family remodels the logistics premium (elevator windows, work-hour limits, COI churn, board inspections, engineer letters) is real and gets priced into every trade.
How long does a condo remodel take, start to finish?
Plan for 4–8 months from signed project agreement to final inspection for most Boca condo projects. Breakdown: board alteration-agreement package assembled and submitted 2–3 weeks; board review 2–6 weeks from complete submittal (incomplete packets add 2–4 weeks per revision); City of Boca Raton permits 5–7 weeks on a separate track after board approval; on-site build 8–20 weeks depending on scope and the building's work-hour window. Condo schedules are compressed by work-hour limits a 10-week single-family project commonly runs 14–16 weeks in an oceanfront tower with 10am–3pm loud-work windows.
Do I need board approval, and what goes into the package?
For any work beyond strict cosmetic, yes. Under Florida law and every Boca condo's declaration, alteration of a unit requires an alteration agreement signed by both owner and association before work begins. A complete package typically includes: alteration agreement signed by owner and board; Certificate of Insurance naming association and management company as additional insureds; copy of our state general contractor license (CGC1514129); project summary with scope drawings and materials list; written timeline; refundable damage deposit or performance bond (varies by building). For projects touching plumbing stacks, electrical panels, or load-bearing elements, boards often require an engineer letter. We assemble every piece you sign and attend the board meeting if required.
Does my contractor need to give my building a COI, and what goes on it?
Yes every Boca condo building requires a Certificate of Insurance before any work, and most require it posted with the concierge or management before the contractor's first elevator reservation. A proper COI names the association, the management company, and usually the board as additional insureds under CG 20 10 (ongoing operations) and CG 20 37 (completed operations) endorsements, and typically requires a waiver of subrogation. General-liability limits and umbrella requirements vary by building. Workers comp is required for any contractor with employees; subcontractors provide proof or a Florida Certificate of Election to be Exempt. We handle the COI paperwork with your management company directly.
What are the sound-transmission rules, and can I install hardwood?
The Florida Building Code requires IIC = 50 lab or = 45 field, and STC = 50 lab or = 45 field between dwelling units. IIC measures footstep and impact noise; STC measures airborne voice and TV. A bare concrete slab rates only IIC 28–35 below code so any hard-surface flooring requires an acoustic underlayment. A 6mm cork underlayment adds 15–22 IIC points; engineered acoustic mats (QuietWalk, Pro-Flex) add 18–28 points. Many Boca boards layer their own rules on top a common one is the "80/20 rule" or "15% rule" limiting hard-surface flooring to a percentage of unit area or requiring soft-covered flooring in bedrooms. We spec the underlayment and floor assembly to pass both code and board rule, and schedule a field IIC test (ASTM E1007) before closeout when a board requires one.
Can I move my kitchen or bathroom?
Usually no and this is the biggest constraint most new condo owners discover after committing to a remodel. Your kitchen and bathroom are located where the vertical plumbing stacks land; that stack serves every unit above and below your column. Relocating it risks leaks, loss of pressure, code violations, and litigation from neighbors in your column. Within the existing footprint you have significant freedom reconfigure cabinet layout, move appliances within a few feet, change sink location within the vanity or counter run. Moving the kitchen to the living room or a bath across the unit is almost never feasible in a standard Boca high-rise and requires formal engineering review plus board approval even when it is.
What are the work-hour, elevator, and logistics rules in a Boca condo?
The City of Boca Raton's noise ordinance prohibits construction noise above residential limits before 7am or after 6pm Monday–Friday, before 8am or after 6pm Saturday, and any time on Sunday. Condo boards typically narrow this further common building windows are 9am–4pm or 9am–5pm Monday–Friday, with loud work (demo, tile cutting, jackhammer) often restricted to 10am–3pm. Weekends and holidays are almost always prohibited in occupied towers. Freight elevators typically require 48–72 hour advance reservation in 4-hour blocks, with a refundable damage deposit (commonly $250–$1,000). We build your building's specific rules into the written schedule at project agreement signing.
Can I live in the unit during a condo remodel?
For a single-room refresh or a kitchen-only project in a large unit, yes we seal the work zone with plastic barriers + negative-pressure fan, keep one full bath and a temporary kitchen functional, and maintain a clean sleeping zone. For a full-unit gut, almost every client relocates there's no way to isolate a dust-free, sound-reasonable sleeping space when every wet area is offline and demo runs in the work-hour window. Many Boca condo clients are seasonal residents who plan the project during months they're not in residence, which also sidesteps the noise and access questions entirely.
What happens to an active project if a hurricane is forecast?
We run a written pre-hurricane closeout protocol. Once the National Hurricane Center issues a watch or warning including Palm Beach County, we: remove all loose material from balconies and common areas (projectile risk); install pre-fit panels over any opened glazing; turn off unit water at our isolation valve; remove tools and loose material from freight elevators and loading docks (building typically requires this 72 hours before projected landfall); walk the unit with the building engineer if required; stage materials off-site until the association reopens access post-storm. Post-storm re-entry is coordinated by management we don't re-enter until the association formally reopens. Any in-progress weather damage is documented for your HO-6 claim within 24 hours of re-entry. Protocol is in every condo project we undertake.
Do I need a City of Boca Raton permit for a condo remodel?
Yes, for almost every real condo remodel not just the board's approval. Under the Florida Building Code and the City of Boca Raton building ordinance, a permit is required any time you alter plumbing, electrical, mechanical, or structural systems, and every real condo remodel touches at least one. Strictly cosmetic work (paint, replacing a vanity into identical plumbing, swapping a toilet in place) is exempt. City permits run on their own track separate from board approval we pull every required permit in our name as the licensed GC (CGC1514129), schedule inspections, and deliver every permit and inspection report in your closeout binder. Board approval is the first gate; City permit is the second.
How are payments structured, and does board approval affect payment timing?
Condo remodels are drawn as milestone draws tied to written completion gates not time-based invoices. Typical schedule: 10% earnest at project agreement signing; 10–20% at board approval + COI posted (applied to permits, design, and long-lead material orders, compliant with Florida Statutes 489.126 limits); then draws at demo complete, rough-trades inspected, drywall complete, cabinets + stone set, and final with punch and closeout. Each draw invoices against verifiable progress with lien waivers from every paid subcontractor. Some buildings require a board-observed inspection at demo and at pre-tile waterproofing we build those into the schedule as formal milestones.
Still have questions?

Tell us about your unit and ask anything else on your mind Jorge reads every message and replies personally. Go to the form