Boca Raton whole-home renovation — one GC, one schedule, every room
Multi-room renovations for Boca Raton and Palm Beach County homeowners. Kitchen, baths, flooring, paint, electrical, plumbing 8 to 12 trades sequenced on a single written schedule under one licensed GC. Jorge Monroy is on site each week, and every gate is written into your project agreement.
A whole-home renovation is a scheduling problem first
Most whole-home renovations that go sideways in Boca do not fail on craft. They fail on coordination. A kitchen sub finishes his rough and sits idle because the plumber is on another job. Cabinets arrive on a Tuesday with nowhere to stage them. The tile guy shows up before the floors are flat. Two subs invoice for the same week of work. By week ten the homeowner is the project manager, and they didn't sign up for that job.
A whole-home renovation touches 8 to 12 trades. We build one Gantt-style schedule at project agreement signing that sequences every trade, every long-lead order, and every permit gate. Jorge is on site weekly to call the next trade and close the last. Your formal agreement names each milestone, and each progress draw is tied to verifiable completion not a calendar.
Jorge's standard practice is to pull every required permit in his name as the licensed general contractor (CGC1514129). For any structural wall removal we retain a Florida-licensed structural engineer to seal the beam drawings; the engineer's stamp goes into your closeout binder alongside every inspection card.
We interviewed four contractors for a full-gut whole-home. Jorge was the only one who handed us a dated schedule Gantt chart, every trade, every material order before we signed a project agreement. When our cabinet order slipped two weeks, he re-sequenced the tile and floor trades the same day so we didn't lose a day overall.
Individual results vary; past projects are not a guarantee of future outcomes.
What Boca whole-homes actually cost in 2026
Real ranges from the last 36 months of our whole-home invoices across Boca Raton and the surrounding Palm Beach + Broward communities middle-of-the-road numbers, not teaser minimums. Your project is priced documented once Jorge has walked every room; these ranges are a starting frame, not a quote.
Rooms stay, everything updates
Major multi-room gut
Structural, imported, bespoke
Project-total ranges labor, material, permits, contingency, engineering fees. Quotes are fixed-price, written, valid 30 days. Florida sales tax and county surtax apply to taxable materials. Allowance lines for long-lead items (cabinets, stone, specialty appliances) are itemized separately and reconciled at final.
Single-room projects, same discipline
A whole-home renovation starts with a kitchen and one or two baths for most of our clients and those rooms are where the craft gets judged. Our companion kitchen remodeling and bathroom remodeling work follows the same permit and supervision discipline as the whole-home projects on this page; every waterproofing and ventilation spec on the bathroom page applies identically inside a multi-room scope. If your plans include pushing out the footprint a primary-suite expansion, an in-law suite, or a second story our home additions work layers engineer-sealed structural design and zoning feasibility on top of the same coordination.
Six phases. Every gate written into your project agreement.
How a typical TDS Contractors whole-home renovation runs, permit phase included. Actual duration varies by project; your project agreement sets the specific schedule. Simpler coordinated refreshes finish faster (10-14 weeks total); estate-level gut renovations with structural work can run 2840 weeks. Custom or imported cabinets can add 4-10 weeks of lead time on top we order at signing so the clock runs in parallel with permit review.
Design lock & permit submittal
Stamped drawings, structural engineering where required, long-lead material orders placed. Submittals to the applicable Palm Beach County jurisdiction (Boca Raton eHub, Delray, unincorporated PBC) and HOA architectural review package prepared.
Demo & protection
Room-by-room demolition per the phasing plan. Full dust barriers, negative-pressure fans, floor and wall protection. Dumpster staged off the main drive where possible. Sleeping and working zones sealed and maintained separate HVAC where feasible.
Structural & rough trades
Wall removal with engineered beam install where applicable. Rough plumbing, rough electrical, HVAC revisions, and fire-blocking sequenced in the right overlap. Inspections scheduled as each trade finishes not as a batch at the end.
Insulation, drywall & substrate
Close-wall inspections pass, insulation and drywall go up across all rooms. Cement backer and waterproofing in wet areas (flood-tested 24 hours before tile). Floor substrate prep for tile, wood, or LVP leveling compound where needed.
Finishes & install
Cabinets set in kitchen and baths; stone templated, fabricated and installed; tile set across wet areas and backsplashes; flooring laid throughout; paint; trim and finish carpentry; lighting; plumbing fixtures; appliances hooked up.
Final inspections, punch & handover
Final building, electrical, plumbing, and mechanical inspections. Certificate of Completion. Punch-list walkthrough with Jorge, every item closed documented. Closeout binder delivered permits, inspections, engineer's stamps, lien waivers, commitments, appliance manuals.
Walk the project with Jorge. Leave with numbers.
A complimentary ~45-minute on-site consultation with a written follow-up covering preliminary scope, timeline range, and rough budget range. No purchase obligation.
Florida Certified General Contractor · License CGC1514129
Questions we get on every whole-home call
How much does a whole-home renovation cost in Boca Raton?
How long does a whole-home renovation take?
Can we live in the house during a whole-home renovation?
How do you schedule all the trades so nobody's waiting?
Do you handle permits and HOA approvals for whole-home projects?
What happens with structural changes or removing walls?
How are payments structured across a multi-month project?
What kind of support do you provide after a whole-home renovation?
Tell us about your home and ask anything else on your mind Jorge reads every message and replies personally. Go to the form↓